Laserfiche WebLink
<br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Agenry or organization name : DMG <br />Task t 005 Stata : Co/o2do PermiVjoh# : M-99-038 <br />Date' 09/74N9 County : La Plata Abhreviation :none <br />User : SSS Sile :Rowe Gravel Filename : M03B-005 <br />Permit or other job action :New Application <br />Task description :Replace topsol/over pi[ slopes and Moor <br />HOURLY EQUIPMENT COST Basic machine :Car D8N (1996) Horsepower : 285 <br />Blade type :Semi-Universal <br />Attachment no 1 : ROPS Cab Shill basis : 1 per tlay <br />Attachment no. 2 :3-shank riocer <br /> Utilization W Cost data source : (CRG) <br />Cost Breakdown : Ownership cost/hour : $41.10 NA <br /> ODeraung cosVhour : $55.64 100 <br /> Ripper op. cosVhour : $0.00 0 <br /> Operator cosVhour : 523.72 NA <br /> Total unit cosVhour : $119.86 Total Beet cosUhour' §119.88 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 1,387 LCY factor : NA volume: 1,387 LCV <br />Source of quan tity take-o8 : 750'L x 30'W mgraded slopes covered w/ 6.01 topsoil <br /> <br />Source of est. sure)) (actor : NA <br /> <br />HOURLY PRODUCTION <br /> Job Condition Correction Factors <br />Average push distance: 125 feet Source <br />Unadjusted hourly production : 686 LCY/hr <br />Matefial consistency description <br />Patlly rnncnlirlnlurl elMLnib <br />Average push gradient. 16.50 % (negJ <br />Average site altitude : 6,600 feet <br />Material weigh) : 2,100 Ibs/LCV <br />Material weight description <br />Earth -Loam <br />Operator skill: 0.75 (avl <br />Material consistenry: 1.10 (Carl <br />Dozing method : 1.10 (50% <br />Visibility : 1.00 (av5 <br />Job eRciency: 0.83 (fshilb <br />Spoil pile: 0.80 (Inb <br />Push gradient: 1.36 (Call <br />Alulude: 1.00 (Call <br />Material weight : 1.10 (Cal I <br />Blade type : 1.00 (S or <br />Nel correction : 0.90 <br />Adjusted unit production : 614.95 LCY/hr <br />Adjusted Oeel production 814.95 LCY/hr <br />JOB TIME AND COST <br />Fleet size : / Dozers) <br />Unit cost : $0.795 /LCY <br />Total job time : 2.28 Hours <br />Total job cost : §270 <br />