My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-10-01_PERMIT FILE - M1982200
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1982200
>
1982-10-01_PERMIT FILE - M1982200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2020 10:07:20 AM
Creation date
11/25/2007 12:31:52 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982200
IBM Index Class Name
Permit File
Doc Date
10/1/1982
Doc Name
LIMITED IMPACT 110 & SPECIAL TEN DAY 111 PERMIT APPLICATION FORM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br /> 1 <br /> ' EXHIBIT E - RECLAMATION PLAN <br /> ' FINAL GRADING <br /> ' After mining activity has been completed and all equipment <br /> has been removed from the site, areas surrounding the quarry site <br /> ' will be contoured to conform with the natural surrounding topo- <br /> graphy and drainage . It is anticipated that this recontouring <br /> will provide sufficient plant growth media to cover the rock <br /> ' base of the quarry with 8-10" of plant growth media. All recon- <br /> toured slopes will be no steeper than a 2 :1 ratio. It is anti- <br /> cipated that the mining procedure will not leave a granite high- <br /> wall . However, in the event a highwall were to be present at the <br /> conclusion of mining, then the highwall will be stabilized by re- <br /> moving any loose rock, leaving a solid unbroken surface . The <br /> existing roadbed from the quarry to the top of the first rise <br /> ' will be ripped prior to seeding; water bars will also be placed <br /> on the ripped surface before seeding takes place to aid in erosion <br /> ' protection (Table 1, BLM Specifications) (Map 2 , Exhibit Q . <br /> ' The road from the top of the hill above the quarry down to <br /> the Guffy Road will be cleared of all culverts after mining and <br /> ' will then be scarified and planted with the prescribed seed mix <br /> less the shrub seed (Table 4) . Water bars on existing roads will <br /> ' be upgraded and seeded meeting BLM specifications (Tables 1 and 4) . <br /> Structures. created to route drainage of water around the <br /> quarry will be replaced with appropriate slopes and directions to <br /> ' provide 'a continuous drainage pattern. These drainage areas will <br />
The URL can be used to link to this page
Your browser does not support the video tag.