Laserfiche WebLink
' 12 <br /> 1 <br /> EXHIBIT E - WATER RESOURCES <br /> ' A dry drainage system exists above the proposed quarry <br /> ' operation. The drainage does not exhibit water flow except <br /> following the occurrence of snow melt or heavy rain. Surface <br /> ' drainage from the above drainage will be diverted around the <br /> ' mining site by means of diversion ditches and natural drainage <br /> ways , incorporating culverts or dry creek drainage cr3ssings <br /> ' where necessary . Quarrying the solid rock outcrop will not <br /> interrupt the water table since mining will not occur '-elow .the <br /> ' ground level . <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br />