Laserfiche WebLink
9. This reclamation plan includes the flexibility to develop the low areas within <br />the excavation area to control stormwater. If these low areas collect a <br />substantial amount of water for an extended period of time, the landowner <br />will be notified. <br />10. Local access roads will be developed for the construction and mining of this <br />facility. They will be graded and drained, and at the landowner's option, <br />some roads may remain for post-mining use. <br />Exhibit E -Reclamation Plao (page Z) <br />