Laserfiche WebLink
plant. Road base materials will be stockpiled by this method. The second mining <br />procedure will be for "pit-run" materials. This sand and gavel will be loaded onto trucks <br />and transported off-site to construction projects in the county highway system as needed. <br />In all cases, during periods of inactivity, the vertical mining face will be sloped back for <br />safety reasons. The operation will not impact the hydrological balance, or create off-site <br />damage. The disturbed areas will be re-vegetated according to the reclamation plan. <br />Exhibit D (page2) <br />