Laserfiche WebLink
4.b.2. Please include the total length of new spur road which will need to be reclaimed. <br />4.b.3. What seed mix is proposed for revegetation? <br />4.b.4. What are the anticipated depths of the drillholes? <br />4.6.5. Does the applicant anticipate encountering any water-bearing units during the <br />drilling? <br />4.b.6. Please describe how the drillholes will be sealed in accordance with Rule 4.07. <br />4.b.7. Will any drillholes be developed into water wells? <br />If you have any questions, please call me at 303-866-4928. <br />Sincerely, <br />Jim Burnell <br />Environmental Protection Specialist <br />Cc: S. Brown; K. Gorham <br />