Laserfiche WebLink
Schumacher #3 Gravel Pit <br />Task <br />Bac~ll and Grade <br />to 3h:1v slopes <br />Replace Topsoil <br />Scraper <br />TractodSpeedy Move <br />Revegetate Site <br />Cover Crop <br />Grass Seeding <br />Seed <br />Fencing <br />Mobilizafion <br />Scraper <br />TractodSpeedy Move <br />Dozer <br />Volumes Units <br />89.5 Hours <br />72 Hours <br />72 Hours <br />31.7 Acres <br />31.7 Acres <br />121.7 Lbs <br />1 Fence <br />2 Hours <br />2 Hours <br />2 Hours <br />Unit Cost Item Cost <br />115.00 $10,292.50 <br />145.00 $10,440.00 <br />75.00 $5,400.00 <br />45.00 $1,426.50 <br />45.00 $1,426.50 <br />8.70 $893.48 <br />500.00 $500.00 <br />145.00 $290.00 <br />75.00 $150.00 <br />115.00 $230.00 <br />$31,048.98 <br />