Laserfiche WebLink
Table 5-1. Cont. -paste 2 <br />. Topsoil Coordinates Size Approximate Date <br /> Pile ID Location Northing Easting (acres) CYDS Created <br /> FS1 Anfo silo 410,280 1,410,900 0.2 550 1980 <br /> Gt-02 East Edge of G Pit 403,670 1,440,337 7.4 213,612 2002 <br /> G2-02 East Edge of G Pit 404,433 1,440,265 1.9 18,144 2002 <br /> G3-02 G Pit Interior 403,565 1,438,424 0.9 16,296 ~ 2002 <br /> G4-02 North A-E & LOM Roads Intersection 406,728 1,436,968 2.1 137,784 2002 <br /> G10-1 North of LOM rd @ G Pit 407,740 1,434,270 4.0 105,532 2001 <br /> GP-1 Grouse Pond 412,925 1,429,530 0.9 13,212 1993 <br /> H93-1 H pit West#1 411,540 1,422,060 4.7 100,456 1993 <br /> H93-2 H pit North #2 412,720 1,422,940 3.3 95,666 1993 <br /> H93-3 South H pit #3 406,940 1,424,040 5.2 82,228 1993 <br /> HRS Horse Pond 403,090 1,432,930 1.0 22,485 2000 <br /> JG1 Johnson Gulch Dam #7A 411,700 1,419,700 1.6 25,116 1980 <br /> JG2 Johnson Gulch Dam #8 412,500 1,420,150 1.2 15,458 1986 <br /> JG3 Johnson Gulch Dam #9 413,100 1,420,300 1.4 14,269 1986 <br /> JG4 Johnson Gulch Dam #10 414,250 1,419,950 1.7 25,777 1987 <br /> JG5 Johnson Gulch Elect Station 414,250 1,419,450 0.5 6,209 1989 <br /> JG6 North A Haul Road Johnson 413,000 1,420,950 1.2 13,212 1987 <br /> JG7 North A Haul Road Ag Field W 412,400 1,422,250 0.5 16,850 1988 <br /> JG8 North A Haul Road Ag Field E 412,300 1,422,700 0.7 12,640 1988 <br /> LG1 Low grade coal topsoil pile 406,800 1,418,500 3.7 105,748 1985 <br /> MH1 Main haul road north 411,710 1,418,660 1.0 27,334 1986 <br /> MH2 Main haul road south 410,800 1,418,550 1.2 35,216 1982 <br /> MP1 Middle Pyeatt Dam #1 412,200 1,425,030 0.6 4,200 1986 <br />• MP2 Middle Pyeatt Dam #2 413,000 1,425,220 1.2 12,500 1986 <br /> MP7 Middle Pyeatt Sediment Basin 411,000 1,425,400 0.2 645 1991 <br /> NN1 No Name Dam #4 412.900 1,415,640 1.0 10,372 1980 <br /> SC3 S curve east of (haul road runaway) 407,400 1,417,860 1.2 11,477 1989 <br /> SP5-94 SW of Sage Pond 412,600 1,430,555 0.6 6,318 1994 <br /> SP6-94 SE of Sage Pond 412,700 1,431,200 0.7 12,204 1994 <br /> SY1 Shop yard pullout expansion 413,660 1,419,250 0.2 900 1990 <br /> WB2 West Buzzard Gulch West 411,200 1,407,300 0.3 1,580 1987 <br /> WB3 West Buzzard Gulch East 411,250 1,407,600 0.2 1,124 1987 <br /> WCi Wye coal pile site 412,600 1,417,500 2.6 53,197 1978 <br /> WP2 West Pyeatt Dam #1 413,200 1,424,190 1.2 10,404 1991 <br /> WP3 West Pyeatt Pond #2 412,440 1,424,180 1.3 11,322 1992 <br /> ZTS-f East of A97-1 Pile 405,440 1,430,900 6.5 133,476 2000 <br /> ZTS-2 West of A99-1 Pile 408,270 1,434,100 0.7 14,644 2000 <br /> ZTS-3 Head of Horse Gulch 404,340 1,433,240 4.5 128,436 2001 <br /> Totals 201.3 4,426,236 <br />' In accordance with MR-155, all of piles A86-6, A92-4 and A92-5 were abandoned and A91-8 and A92-1 <br />were partially abandoned. <br />(1) As of December 31, 2002 <br />~~ <br />Io2rsiaes-i1 <br /> <br />