|
Table 5-1. Trapper Mine Topsoil Pile Inventory l11
<br />
<br />• Topsoil Coordinates Size Approximate Date
<br /> Pile ID Location Northing Easting (acres) CYDS Created
<br /> A76-4 GB well site 410,070 1,417,400 0.5 7,805 pre 1976
<br /> A77-1 Afield coal pile 409,850 1,411,300 1.3 12,944 1977
<br /> A88-1 North A Haul Road W of REA Line S 405,450 1,425,100 1.7 .60,480 1988
<br /> 'A91-8 NW Edge of H Pit Reclamation 410,800 1,421,400 5.1 67,159 1991
<br /> 'A92-1 North A Road East of East Pyeatt 411,900 1,427,900 12.5 . 336,429 1992
<br /> A92-2 Middle Pyeatt Regrade Spoils 409,800 1,426,000 6.0 179,676 1992
<br /> A92-3 North A Road East of West Pyeatt 412,100 1,424,400 0.6 7,632 1982
<br /> A93-1 A pit South #1 406,550 1,426,040 3.9 86,454 1993
<br /> A94-2 E of Grouse Drainage 412,000 1,429,300 4.4 106,046 1994
<br /> A94-4 S of A pit cut 406,500 1,429,600 3.9 124,880 1994
<br /> A95-2 Oak Pond 410,400 1,433,030 1.1 13,548 1995
<br /> A96-1 Mid A Spoil Road 409,800 1,429,450 2.1 52,612 1996
<br /> A96-2 North A Pit west of A 95-2 411,100 1,432,100 3.0 27,812 1996
<br /> A97-1 South A Pit east side of F4 Road 405,460 1,430,250 2.6 57,172 1997
<br /> A97-2 South of LOM Road 408,150 1,429,200 1.5 87,920 1997
<br /> A97-3 North end 97A-T/S Laydown 411,200 1,430,230 0.5 15,484 1997
<br /> A98-1 F3 and F4 Road Intersection 407,070 1,430,520 2.6 45,248 1998
<br /> A98-2 Middle A Road North Side 409,300 1,430,730 2.9 80,332 1998
<br /> A98-3 West Middle Flume Pond #3 407,500 1,438,240 5.3 193,928 1998
<br /> A99-3 East Middle Flume Pond 407,630 1,437,275 0.8 9,000 1999
<br /> A10-1 South of AET-1 405,800 1,440,660 4.1 77,868 2001
<br /> AET-1 East of East A Pit 406,680 1,440,770 5.0 168,196 2000
<br /> ASH1 Johnson Gulch East Tributary 408,000 1,421,200 3.9 97,092 1992
<br />. ASH2 Johnson Gulch East Tributary 408,200 1,422,000 1.3 27,486 1992
<br /> BUZ92-1 Far East Buzzard Pond #1 411,100 1,410,250 0.4 882 1992
<br /> CG1 Coyote Gulch 411,050 1,412,200 4.8 18,309 1978
<br /> D92-1 Deer Pond #1 400,700 1,417,650 3.7 19,150 1992
<br /> D93-1 North D pit #1 407,725 1,418,160 0.5 20,570 1993
<br /> D97-1 North end Enfield Pit 405,640 1,419,440 1.8 49,168 1997
<br /> E78-1 E pit SE pile small 402,490 1,422,730 0.7 10,000 1978
<br /> E78-2 Middle E pit pile 404,400 1,423,100 4.5 25,238 1978
<br /> E79-4 E pit SE pile large 401,900 1,422,650 2.8 34,010 pre 1979
<br /> E79-6 Castor Gulch road E pit pile 401,200 1,420,950 9.0 208,968 pre 1979
<br /> E87-12 E pit regrade pile 403,850 1,422,350 4,1 73,278 1987
<br /> E89-11 E pit Ute Gulch 402,100 1,420,100 0.2 1,100 1989
<br /> E93-4 North E pit #4 408,750 1,421,050 0.9 16,746 1993
<br /> E93-5 Middle E pit #5 403,955 1,419,950 0.8 53,610 1993
<br /> E94-1 W of D East Road 404,280 1,420,370 0.3 2,304 1894
<br /> E94-2 N of D East Road 407,270 1,418,750 0.2 1,200 1994
<br /> EB1 East Buzzard Gulch 411,100 1,409,720 0.4 4,224 pre 1987
<br /> EFL East Flume Pond 407,740 1,440,350 0.7 6,076 2000
<br /> EG1 Elk dam 401,200 1,414,920 0.1 1,027 1987
<br /> EMt E. of Explosive Magazine 411,330 1,414,300 0,4 5,456 1980
<br /> EP2 East Pyeatt Dam #1 East 412,150 1,426,900 0.3 3,700 1988
<br /> EP3 East Pyeatt Dam #2 West 413,100 1,426,380 0.6 7,500 1988
<br /> EP4 East Pyeatt Dam #2 East 413,200 1,426,750 0.4 4,500 1988
<br /> F95-1 West Edge of F Pit 403,500 1,426,200 3.7 89,278 1995
<br />• F95-2
<br />F96-1 F-Pit north of F95-1
<br />North End of Ash Dump 405,300
<br />408,311 1,426,400
<br />1,428,096 7.2
<br />1.7 164,150
<br />22,120 1995
<br />1996
<br /> F96-2 Between Piles F95-1 and F95-2 404,200 1,426,200 22 46,032 1996
<br /> F97-1 South of A97-1 approx. 1,700 ft 403,790 1,430,700 3.0 77,644 1997
<br />
|