Laserfiche WebLink
. SPECIAL PROVISION <br />STOCKPILE TOPSOIL <br />DESCRIPTION <br />This item shall consist of stockpiling topsoil in a designated azea outside the project <br />limits. <br />CONSTRUCTION REQUIREMENTS <br />This work will consist of hauling and stockpiling excess topsoil to a stockpile location. <br />The designated stockpile location is outside the project limits and shown in the plans. <br />METHOD OF MEASUREMENT <br />Topsoil will be measured by the cubic yazd in its final position. <br />BASIS OF PAYMENT <br />• The accepted quantities will be paid for at the contract price <br />PAY ITEM PAY UNIT <br />Stockpile Topsoil Cubic Yard <br />Includes all work and equipment necessary to complete the item. <br />• <br />