Laserfiche WebLink
• SPECIAL PROVISION <br />OBLITERATION OF ATV TRAIL <br />DESCRIPTION <br />This item shall consist of obliterating that portion of the existing ATV trail outside the <br />roadway prism. <br />CONSTRUCTION REQUIREMENTS <br />The obliteration shall consist of scarifying the trail, covering it with 4" topsoil and <br />seeding (native). <br />METHOD OF MEASUREMENT <br />Linear foot obliterated, measured along roadway center line stationing. <br />BASIS OF PAYMENT <br />• The accepted quantities will be paid for at the contract price <br />PAY ITEM PAY UNTI' <br />Obliteration of ATV Trail Linear Foot <br />Includes all scarifying and spreading of topsoil and seeding (native). <br /> <br />