Laserfiche WebLink
• The schedule of monitoring will be as prescribed in Exhibit 15, <br />Hydrologic Monitoring Plan. Hydrologic data from the monitor sites will be <br />coordinated with stream-flow and water quality monitoring performed at <br />gaging stations upstream and downstream from the permit area. <br />Hydrologic data over the past water-year will be reported annually to <br />the regulatory agency on or before January 31 of the following year. <br />Reporting will continue throughout the bonding period. <br />(5) (a) No permit or permit revision application for surface coal <br />mining and reclamation operations shall be approved by the Division or <br />u <br />• <br />PRen 2.06-41 Revised 06/15/90 <br />