My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123774
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:28 PM
Creation date
11/25/2007 11:53:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006042
IBM Index Class Name
Permit File
Doc Date
6/20/2006
Doc Name
Decision Letter
From
DMG deg
To
MMM Partnership
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />Task # : 001 <br />Date : 08/19/2008 <br />User : DEG <br />State :Colorado PermiUjob# :M-2006-042 <br />County :Logan Abbreviation :none <br />Site :Mmm Partnership Gravel Pit Filename :M042-001 <br />Agency or organization name :DMG <br />Permit or other job action :New 110 Permit <br />Task description :Bacrlcfflling Area to 3h:1v <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Sedes lI - 8SU Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization °h <br />Cost Breakdown : Ownership cosUhour : $47.81 NA <br /> Operetingcosf/hour : $75.29 100 <br /> Ripper op. cosf/hour : $0.00 NA <br /> Operator cosUhour : $32.53 NA <br /> Total unit cosf/hour : $155.43 Total fleet cost/hour : ,f466.30 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 19,096 BCY factor : 1.185 volume : 22,247 LCY <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor :CAT Handbook <br />;:: <br />HOURLY PRODUCTION , <br />Job Condition Cortection Factors <br />Source <br />Average push distance <br />Unadjusted howdy production <br />Material consistency description <br />Compacted fill or embankment <br />150 feet <br />834.3 LCY/hr <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Earth -Dry packed <br />10.00 % (i <br />4,200 feet <br />2,550 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 3 Dozers) <br />Unit cost : $0.371 /LCY <br />Operator skill : 1.00 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.22 <br />Altitude : 1.00 <br />Material weight : 0.90 <br />Blade type : 1.00 <br />Net correction : 0.86 <br />Adjusted unit production : 418.82 LCY/hr <br />Adjusted fleet production : 1,256.48 LCY/hr <br />Total job time : 17.71 Hours <br />Total job cost : x8,256 <br />
The URL can be used to link to this page
Your browser does not support the video tag.