Laserfiche WebLink
•a <br />CIRCES Cost Estimatinst Software <br />Date : 20Jun-2006 Permit or job no. <br />User : DEG Abbreviation <br />Filename <br />agency or organization name :DMG <br />Permit or job action :New 110 Permit <br />Site :Mmm Partnership Gravel Pif <br />State :Colorado <br />County :Logan <br />TASK LIST (DIRECT COSTSI FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Backfi/ling Area to 3h:1v Slopes dozer 3 17.71 $8,256 <br />002 -Replace Topsal Fmm 5 Designated Stockpiles dozer 1 16.4 $2, 726 <br />003 Revegetate Site revege 1 40.0 $11,445 <br />004 -Mobilizabon/Demobilization mobilize 1 4.91 $3,819 <br />inUUdes inflation factor adjustment or: <br />OVERHEAD AND PROFm <br />NA <br />liability insurance <br />Performance bond <br />Job superintendent <br />Profit <br />M-ZtN18-042 <br />none <br />M042-000 <br />SUBTOTALS :~ 79• <br />TOTAL DIRECT COST <br />2.02 % of direct total = $530 <br />1.05 % of direct total = $276 <br />NA' NA NA total = NA <br />10.00 %ofdirect total= $2,625 <br />' not required (or eqp. operator serves as roper) TOTAL O 8 P = $3,430 <br />LEGAL-ENGINEERING -PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+OS P)= $29,676 <br />Financial warranty processing (legal/related costs) : total = <br />Engineering work and/or contrecUbid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cnfr. NA total = $1,484 <br />CONTNGENCY- NA' NA total= NA <br />'contirpencres eocounted !Drat task level TOTAL INDIRECT COST= $4,914 <br />TOTAL BOND AMOUNT (direct + Indirect) _ $31,160 <br />