My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123707
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123707
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:21:25 PM
Creation date
11/25/2007 11:47:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001085
IBM Index Class Name
Permit File
Doc Date
7/8/2002
Doc Name
Clay Liner Design and Relationship to the Amount of Reclamation Bond
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Erica Crosby 4 July 8, 2002 <br />As of now, there has been no liner installed at the pit, hence there is no installed and tested liner eligible for <br />the 20 percent bonding option. In order to obtain issuance of the permit, the Applicant must provide the full <br />$435,500.00 bond amount required to guarantee completion of the approved reclamation plan. The potential <br />exists to implement the 20 percent bonding option in a stepwise fashion as segments of the lined pit slopes <br />are completed. Once the Operator completes some percentage of liner and pit slope installation, they may <br />petition the DMG for partial bond release, and if the DMG concurs that the completed section of pit slope <br />has been correctly completed providing a high degree of confidence that leakage criteria will met, 80 percent <br />of the reclamation bond dedicated to installation of that section of liner may be returned. Although the <br />Applicant is not eligible for the 20 percent bonding option at this time, a plan and specification for <br />installation of the liner has been provided in the Ground report. In order to be eligible for 20 percent <br />bonding following installation of the liner or sections of the liner, the Applicant's proposal must be <br />supplemented as follows: <br />1. A Construction Quality Assurance (CQA) Plan must be incorporated as an enforceable component of the <br />permit. This necessity is recognized on page 6 of the Ground report where it is stated that: <br />The Geotechnical Engineer should observe the exposed excavation surface prior to the placement of <br />fill, and observe earthwork operations and test the soils. Additional hydraulic conductivity tests <br />should be performed of the material as placed. <br />The CQA program is developed to assure that the construction of the soil components are in compliance <br />with the project specifications and to demonstrate achievement of the construction regulatory <br />requirements. The CQA monitor is the firm or individual responsible for performing the quality <br />assurance tasks. The specific responsibilities of the CQA monitor include: <br />a. review the drawings, specifications, and related guidance documents; <br />b. observe excavation activities and backfilling operations; <br />c. obtain preconstruction and construction samples and perform material evaluation testing as required; <br />d. monitor and document material placement, including soil type, clod and particle size, loose lift <br />thickness, moisture conditioning process, compaction equipment and methods, number of passes with <br />compactors, uniformity of compaction coverage, compacted lift thickness, bonding of lifts and in- <br />place moisture content and dry density as required by the specifications; <br />e. assure that testing equipment used and tests performed are conducted according to specifications and <br />industry standards; <br />f. document and report test results; <br />g. report any deficiencies in the construction and how they are resolved; <br />h. prepaze a construction certification report describing the construction, any deviations from the <br />specifications or drawings and details (with reasons and resolutions), field and laboratory test data <br />and results, and will include professional certification that construction was completed in accordance <br />with the plans and specifications. <br />The following [able is an example testing protocol for a clay liner project. <br />