Laserfiche WebLink
(CON71N~ <br />PROJECT: Sun Coal Meadows No. 1 Mine <br />LOCATION: Reclamation Project <br />Routt County, Colorado <br />SOURCE: <br />DENSITY-COMPACTION TEST RESULTS <br />PROJECTNO.: 31102.0 DATE:?/9, 7/11, 1/12(84 <br />REPORT NO.: TIME : <br />SAMPLE NO.: ENGINEERING TECHNICIAN: .loch Rn~on <br />TEST DEPTH PROCTOR OPTIMUM DRY <br /> <br />NO Pond No. 1LOCATION OR DENSITY MO1S1' DENSITY CONT OMPACTIO SOIL TVPE <br />. looking down drainage at dam ELEVATION PCF CONTENT PCF ~ A~ REQ. <br /> <br /> e core rent <br /> +3 feet fill 113.5 12.0 107.85 16.6 95.0 90 CL-CH <br />13 center core trench <br /> +4 feet fill 113.5 12.0 110.3 12.6 97.2 90 CL-CH <br />14 right core trench <br /> +4 feet fill 113.5 12.0 115.5 12.9 101.8 90 CL-CH <br />15 center core trench <br /> +5 feet fill 113.5 12.0 105.7 16.1 93.1 90 CL-LH <br />16 right core trench <br /> +5 feet fill 113.5 12.0 114.7 16.2 101.1 90 CL-CH <br />17 left core trench <br /> +6 feet fill 113.5 12.0 111.6 15.8 98.3 90 CL-CH <br />18 left No.18,19,20 113.5 12.0 113.95 14.4 100.4 90 CL-CH <br />19 center are at out- 113.5 12.0 105.7 15.9 93.1 90 CL-CH <br /> let pipe <br />20 right center level 113.5 12.0 117.3 14.2 103.3 90 CL-CH <br />21 over and around outlet pipe 1+ feet of 113.5 12.0 112.35 12.9 99.0 90 CL-CH <br /> (downstream) fill <br />22 over and around outlet pipe 1+ feet of 113.5 12.0 107.4 14.0 94.6 90 CL-CH <br /> (upstream) fill <br />23 right 2+ feet of 113.5 12.0 107.7 12.8 94.9 90 CL-CH <br /> fill <br />EQUIPMENT: Campbell Pacific Nuclear Corp. TYPE OF TEST: 8 inch transmission/1 minute <br />MC-1 Moisture/Density Gauge TEMPERATURE: 60-85° <br />WIND: 5-10 mph <br />PRECIPITATION: None to trace ~ <br />DENSITY -COMPACTION TEST RESULTS k'h No: 31102.0 <br /> Date: <br />FO X Consulting Engineers and Geologists <br /> Figure <br />n <br /> <br />nr°.o <br />