Laserfiche WebLink
DENSITY-COMPACTION TEST RESULTS <br />PROJECT: Sun Coal Meadows No. 1 Mine pROJECT NO.: 31102.0 DATE: 7/9, 7/11, 7/12/F <br />Reclamation Project <br />LOCAT-ON:Routt County, Colorado REPORT NO.: TIME: <br />SOURCE: SAMPLE NO.: ENGINEERING TECHNICIAN: Josh Rosen <br />TEST <br />Pond No. 1 LOCATION DEPTH <br />OR PROCTOR <br />DENSITY OPTIMUM <br />MOI5TUR DRY <br />DENSITY <br />CONT <br />OMPACTIO SOIL TYPE <br />NO. looking down drainage at dam ELEVATION PCF CONTENT PCF ~ A~ R%Q• <br /> <br />1 right center ~o.l-No.2 are 113.5 12.0 116.05 12,4 192.3 90 CL-CH <br /> or 1st foot <br /> ' f fill in <br />2 left center ore trench 113.5 12.0 115.9 13.1 102.1 90 CL-CH <br />3 right center o.3-No.4 are 113.5 12.0 125.3 10.1 110.4 90 CL-CH <br /> or 2nd foot <br /> f fill in <br />4 left center ore trench 113.5 12.0 104.75 11.5 92.3 90 CL-CH <br />5 left o.5, 3rd ft. 113.5 12.0 113.15 12.5 99.1 90 CL-CH <br /> f fill in <br /> ore trench <br />6 left center o.6 ,7 ,8 are 113.5 12.0 102.85 12.3 90.6 90 CL-CH <br />7 right center or 4th ft.of 113.5 12.0 112.35 12.6 98.9 90 CL-CH <br /> ill in core <br />8 left trench 113.5 12.0 112.25 12.9 98.9 90 CL-CH <br />9 left center core trench <br /> +1 foot fill 113.5 12.0 116.55 13.2 102.6 90 CL-CH <br />10 center core trench <br /> +2 feet fill 113.5 12.0 120.4 11.2 106.1 90 CL-CH <br />11 right, right center core trench <br /> +2 feet fill 113.5 12.0 117.65 11.6 103.6 90 CL-CH <br />EQUIPMENT: Campbell Pacific Nuclear Corp. TYPE OF TEST:B inch transmission/1 minute j <br />MC-1 Moisture/Density Gauge TEMPERATURE: 60-85° <br />WIND: 5-10 mph <br />PRECIPITATION: None to trace (working hours) <br />Heavy rain late p.m. 7/9, early a.m <br />7/10/84. <br /> <br />DENSITY -COMPACTION TEST RESULTS k~b Nn: 31102.0 <br />~ Date: <br />FO X Consulting Engineers and Geologists Figure <br />n <br />nrn.~ <br />