Laserfiche WebLink
• Conclusion <br />Sedimentation Pond 017 does meet or exceed the design and performance requirements <br />of the CMLRB's regulations. SCC will inspect the pond quarterly to evaluate structural <br />integrity, storage capacity conditions, and remedial work requirements in accordance with <br />the approved mine permit. Therefore, pursuant to Rule 4.05.6(10), the above is the <br />Sedimentation Pond 017 as-built certification report. <br />J <br />i• <br />13-5H-4 <br />