<br /> <br />APPENDIX G <br />WELL FIELD SPILL PLAN <br />YANKEE GULCH SODIUM MINERALS PROJECT <br />AMERICAN SODA, L.L.P. <br />1.0 INTRODUCTION <br />The Yankee Gulch Project Piceance Site consists of the well field area and the initial <br />processing area. This Plan covers spills that may occur in the well field area due to well <br />field piping failures. Spills in the initial processing area and other emergency situations <br />are covered in the preliminary Response Plan. This Plan is provided as an appendix to <br />the preliminary Response Plan because there is not a specific regulatory requirement for <br />this Plan. The fluids that will be carried by the well field piping, which are mainly <br />sodium bicarbonate and sodium carbonate solutions (sodium solutions), are not <br />regulated materials under EPCRA, CERCLA, or RCRA. <br />Solution mining will occur within vertical solution mining wells at the Piceance Site. <br />Approximately 15 wells will be in operation at any given time, with the exception of <br />commercial operation startup when about 26 wells will be in operation. There will be <br />an aboveground network of piping that will carry solution mining fluids between wells <br />and the initial processing facility. Each 5-year mining panel will contain a main header <br />system. The main header will be connected to lateral piping, and lateral piping will <br />connect to individual well piping. Each of the piping systems will contain three pipes. <br />Injection fluid will be transported from the initial processing facility to each solution <br />mining well in one pipe. Production fluid will be transported from each well to the <br />initial processing facility in another pipe. The third pipe will be used as a spare pipe for <br />recirculation purposes (mainly for preheating cavities and performing cavity retirement <br />procedures). Damage to this piping network could cause the introduction of sodium <br />solutions to the environment. <br />2.0 SOURCE DESCRIPTION <br />The above ground piping network in each 5 year panel will be installed on pipe racks. <br />Pipe racks will be constructed approximately 18 inches off ground in the well field area <br />and approximately 16 feet off the ground in the initial processing area, for vehicle <br />clearance. Although the well field piping is an above ground system, piping will be <br />installed underground in a few areas. These areas include crossings for roads within <br />the mining panel and other areas to allow for deer crossing. Pipes will be insulated in <br />order to minimize heat loss. Information on the header, lateral, and individual well <br />piping is summarized in the following table. <br />Preliminary Response Plan <br />Yankee Culch Sodium Minerals Project <br />American Soda, L.L.P, <br />1 <br />