Laserfiche WebLink
BackfillinQ and Grading. <br />• The next step in the reclamation plan involves the backfilling of the portal areas as well as other facility areas <br />requiring backfill. Areas requiring backfill are included on Table 63, Overburden Redistribution. Comparing existing <br />topography with the topography to be achieved after reclamation generated all volumes included in the Table. The <br />final topography for the areas listed on Table 63, Overburden Redistribution, are presented on the Reclamation Plan <br />Map (Map 29). The backfilled areas will then be graded. The various backfilled areas will be rough graded to the <br />~J <br /> <br /> <br />MidTerm Response 2.05-23.1 Revised 12/05/01 <br />iR33 <br />