Laserfiche WebLink
• seepage of surface or groundwater through the seal and the block walls <br />will be keyed into the mine openings. The void between the block barriers <br />and the portals will be backfilled with overburden material. An expanded <br />discussion of closure and reclamation plans is presented in Section <br />2.05.4, Reclamation Plan. <br />\J <br />L~ <br />4.07-2 <br />