4.07 SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Doc Date:1 211 112 0 0 1 III IIIIIIIIIIIII III <br />SI~ 4.07 SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS <br />4.07.1 GENERAL REQUIREMENTS <br />With the exception of drillholes completed as either water supply wells <br />or monitoring wells, all exploration drillholes, boreholes, and exposed <br />underground openings will be plugged and sealed in order to prevent acid <br />or toxic drainage, minimize disturbance to the prevailing hydrologic <br />balance and ensure the safety of animals, persons and equipment within the <br />permit and adjacent areas. <br />4.07.2 TEMPORARY SEALING <br />Drillholes completed as water supply or monitoring wells will be cased to <br />just above the ground surface and capped. No other temporary sealing <br />measures are proposed since capping of wells will adequately address any <br />potential concerns and will facilitate access to the wells when needed. <br />As part of the hydrologic monitoring program, the condition of well <br />installations including surface casing and caps will be inspected on a <br />regular basis. Any damage will be noted and repairs will be completed on <br />a timely basis. <br />4.07.3 PERMANENT SEALING <br />Any drillholes not completed as monitoring wells will be sealed and <br />abandoned. Abandonment will involve establishing a cement grout seal <br />extending approximately 20 feet above and below any water producing <br />zones(s), backfilling the remainder of the drillhole with cuttings to <br />within approximately 20 feet of the collar, cementing an interval from the <br />top of the backfill to approximately three (3) feet below the surface, <br />placing a metal fence post as a permanent marker, and backfilling the <br />remainder of the hole with soil material. <br />• When mining is completed, the mine portals will be sealed to prevent <br />access. Sealing will involve fabrication of concrete block walls located <br />a minimum of 25 feet inby the portal openings. The outside surface of the <br />block walls will be sealed with an MSHA approved sealant to prevent <br />4.07-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.