My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE123070
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE123070
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:55 PM
Creation date
11/25/2007 11:05:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007044
IBM Index Class Name
Permit File
Doc Date
7/2/2007
Doc Name
Preliminary MC.SPCC Plann & Emergency Response Plan
From
Energy Fuels
To
DRMS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />• <br />Page 1 of 1 PROCEDURE VVVII-1 <br />06!29!07 APPENDIX A <br />EMERGENCY RESPONSE PLAN - Initial Response Guide <br />The initial Emergency Response Pian for the surface facilities at the WhirNvind Mine consists of two phases. <br />PHASE 1 NOTIFICATION <br />PHASE 2 OPERATIONS <br />Your PRIMARY RESPONSIBILITY es a First Responder in en emergency situation is the prompt <br />NOTIFICATION of the site EMERGENCY COORDINATOR and 911, ifoff-site Emergency Response Services <br />(EMS) are needed. <br />NOTIFICATION: <br />(1) First Responder reports the following information to one other person immediately prior to starting any <br />direct operations for an accident, spill, or tire. <br />a) The location of the incident. <br />b) The nature of the Incident. <br />c) The extent of Injury, if applicable. <br />d) The type of material spilled, if known. <br />e) The physical exteni of the spill area. <br />f) The First Responder=s intended ccurse of action. <br />g) Method of maintaining communication. <br />(2) The first person contacted by the First Responder notifies 811, If needed, and the Emergency <br />Coordinators. The Emergency Coordinator(s) for the Whiriwmd Mlne are: <br />KENNETH CHAD MINE FOREMAN DIRECT VERBAL COMMUNICATION <br />TIMOTHY PIERCE TECH. SERVICES SUPER. PHONE: 870-864-7775 or 870-864-7245 <br />JESS FULBRIGHT SAFETY DIRECTOR PHONE: 870-884-7778 or 970.864-2116 <br />Following IniOal notification site personnel are mobilized for operations. <br />OPERATIONS: <br />(1) The Emergency Coordinator becomes the Incident Commander and activates the site Emergency <br />Alarm Hom to mobilize the site. <br />(2) All surface personnel assemble at their designated assembly point. <br />Energy Fuels Personnel: Primary Assembly Point Emergency Alarm Horn ~ Offrce Building <br />Back-up Assembly Point: East End of Waste Dump <br />Contractor & Visitor Personnel: Assemby Point: East End of Waste Dump <br />(3) The Incident Commantler <br />• Briefs the assembled response personnel. <br />• Establishes a site command post and communications links onsite and offsite (911, Corporate <br />notification). <br />• Reviews the situation and develops a plan of action for response operations. <br />• Delegates support functions to other response personnel. <br />(4) The Response Operations Plan Is implemented. <br />
The URL can be used to link to this page
Your browser does not support the video tag.