Laserfiche WebLink
~ -. <br />Mr. Mike Leidich - 2 - May 20, 1985 <br />Exhibit L - Reclamation Costs <br />Since the submittal of this application back in 1979, the costs-of-living <br />(ie.: inflation) has gone up as you are well aware of. With this increase in <br />cost-of-living has also been an increase in reclamation costs. Therefore, we <br />belive the costs submitted back in 1979 are exceedingly low. We suggest the <br />following costs far reclaiming the site based on the critical time of Phases <br />IV and V of 25.90 acres. (We have attempted to use the same format as <br />depicted in the application.) <br />Reclamation Costs are based on the following data: <br />l.a. Grass seed mixture 21.5 lbs/ac @ $4.00/lb. $ <br />l.b. Fertilizer mixture, 100 lbs. Agri Chem (N2) <br />(18-46-0) @ $9.60/100 lbs., and 80 lbs. <br />Agri Chem (P 05) (34-0-0) @ $5.80 <br />l.c. Mulch (Straw 3/4 tons/ac @ $100/ton <br />l.d. Labor, 16 personnel-hours/ac @ $6.50/hour <br /> <br />2. Seed mixture drilling, mulch crimping, fertilizing, <br />labor, 1.5 hours/acre @ $60.00/hour $ <br />3. Backfilling and sloping, 3 hours/ac @ $100.00/hour $ <br />86.00 <br />15.70 <br />75.00 <br />104.00 <br />280.70 <br />90.00 <br />300.00 <br />4. Final finish grading, sloping, and resloling <br />(1 acre X 43650 sq. ft. X 1 ft soil depth)/27= <br />1614 yds/ac x $0.75/acre $ 1,210.50 <br />Thus, reclamation costs for the disturbed lands are as follows: <br />1. Backfilling and sloping, 21.88ac+ @ $300.00/ac <br />2. Final finish, grading, resphaing and resoiling <br />25.90/ac @ $1,210.50/ac <br />3. Revegetation of 25.90/ac @ $280.70iac <br />4. Seed mixture drilling, 25.90/ac @ $90.00/ac <br />Total <br />Say <br />$ 6,564.00 <br />$31,351.95 <br />$ 7,270.13 <br />$ 2,331.00 <br />$47,517.08 <br />$47,500.00 <br />