Laserfiche WebLink
J <br />your office on 11-21-2002 indicated that no such application has been received by their <br />office. Please verify that the well permit application has been submitted to the SEO. <br />Exhibit H -Wildlife Information <br />33. Please address the concerns listed in the enclosed letter from the Division of Wildlife. <br />Exhibit I -Soils Information <br />34.According to the soil classification information, it appears that the Green River Very Fine <br />Sandy Loam that will be removed from Phase 1 and placed on the Staging Area may be the <br />best growth medium available on site when the limited amount of Ravola Very Fine Sandy <br />Loam is expended. Please address the suitability of this soil type to establish and maintain <br />plant growth. <br />Exhibit J -Vegetation Information <br />35.Please verify that there are no jurisdictional wetlands located within the proposed affected <br />area. The verification should be completed by the Army Corps of Engineers or a qualified <br />consultant. <br />36.It is recommended that the permit applicant contact NRCS to determine relation of <br />vegetation to soil types and topography of the site. <br />Exhibit L -Reclamation Costs <br />37. Please revise the Reclamation Cost exhibit to include the revisions required by this adequacy <br />review. If disposal of asbestos and other wastes become part of this application, then <br />reclamation costs for those tasks may need to be incorporated into this estimate. This may <br />cause the initial phases of the operation to be the most costly to bond for. Documentation <br />of the amount of material to be disposed of and costs for that type of disposal would need <br />to be submitted. <br />38.A reclamation cost estimate for this operation will be calculated upon receipt of responses <br />to this adequacy review. <br />Exhibit M -Other Permits and Licenses <br />39.This exhibit lists permits and licenses required for this operation. However, each of the <br />items in this exhibit must indicate if they have been obtained or have been applied for. <br />Please revise the exhibit accordingly and re-evaluate whether or not an Army Corps of <br />Engineers Permit is required. <br />Exhibit S -Permanent Man-made Structures <br />40.There is a U. S. West (Qwest?) easement shown of the application maps. Please verify if <br />there is a structure in this easement belonging to U. S. West (Qwest?I. If so, please <br />adequately address this structure as required by Rule 6.4.7 9 and include the structure on <br />the permit maps. <br />