Laserfiche WebLink
NORTHWEST COLORADO CONSULTANTS, INC. <br /> <br />.• •y <br />"~i <br />Project: Pond E Relocation <br />Location: Foidel Creek Mine <br />Client: Preasion Excavating <br />Work Performed: <br />Project No.: 95-2505 <br />Report No.: 5 <br />Date: 10/27/95 <br />Time: 1.0 <br />Mileage: 15 <br />EngrJTech: TT <br />As requested, we visited the project sate on this date and conducted nuclear density test No.'s 18 through 19 on <br />the material being placed. <br />The excavation contractor, Precision Excavating, placed and compacted on-site borrow material for the haul road <br />south of the Pond E dam. <br />A sample was obtained for a checkpoint Proctor determination. The material matched a previous sample on this <br />joo. <br />Remarks: <br />The material tested generally met project specifications. <br />Please refer to the attached sheet for results of today's testing. <br />Verbal Discussions: <br />David Zehner of Precision Excavating was notified of today's test results. <br />..• <br />