Laserfiche WebLink
E: <br />(` i • <br />E <br />R <br />0 <br /> <br />~ r r ~ <br />,'JfINING PLA[Q EXHIBIT D 4 <br />(d) Major, moderate, or minor disturbance will not apply until <br />areas can be completed and isolated for reclamation, except <br />for roadways, etc. as listed in Exhibit C. <br />(e) It is now probable the timetable on the plan to quarry west <br />of the fault zone, north to Highway 50 and west to the gas <br />line in four, 500 to 600-foot wide strips can get started <br />in early 1978 with 2 to 2-2 years for each strip. The <br />second strip will have overburden deposited in the worked <br />out first strip (about k years before the first reclamation <br />could start). In another 2 to 2-~ years the second strip <br />should be ready for grading and reclamation. <br />(f) Maps and Narrative <br />The nature and thickness of the limestone deposit is not <br />confidential and eras described in a narrative description <br />above. The stratum immediately beneath the limestone is <br />a massive, light-grey, fine-grained calcareous sandstone. <br />• <br />