Laserfiche WebLink
Serial No. C-1362 _ <br />(REVISED 3-9-95) <br />CONTROLLED SIIRFACE II58 STIPIILATION <br />SLOP85 40-60~ • <br />Surface occupancy or use is subject to the folloring special aperatiag <br />constraints. <br />Special interdisciplinary team analysis and mitigation plans detailing <br />construction and mitigation techniques will be required on areas with <br />slopes ranging from 40-60t. (The interdisciplinary team could include <br />engineering, soil scientist, hydrologist, landscape architect, reclamation <br />specialist and coal mining engineer.) <br />Mitigation may include, but is not limited to, use of erosion control <br />cloths, mats, geoweb soil support materials, lifting and saving local <br />native vegetation in chunks of sod to be later placed over disturbed areas, <br />reseeding disturbed banks with stabilizing seed 'mix, use of chemical <br />stabilizers, t.ackifiers and blankets and careful design of surface water <br />flow. <br />On lands. described below: <br />Portions of Sec. 27, 28, 29,(30-BLM1, 32,. 33, 34, T13S, R90W, and portions <br />' of Sec.3, 4, 9, 10, T145, R90W, 6th PM with slopes 40-6qk as generally <br />delineated on the attached map prepared by Michael ~K. Ward dated 12-19-96. ' <br />The map is for planning purposes only. In the event of any conflict between <br />written clauses of this stipulation and the.~map, the stipulation clauses <br />shall control. "A11 National Forest System and Bureau of Land Management <br />lands within the leasehold which have slopes ranging. from 40-60k falls . • <br />under jurisdiction of this stipulation. <br />.For the purpose of: <br />Minimizing potential for soil loss, .mass land movement, revegetation.. <br />failure and unacceptable visual impairment.' <br />St may become necessary for a waiver, exception or modification (wEM) Co <br />this stipulation for the operator/lessee to 'use the surface in the area <br />~~ covered by this stipulation to allow for the recovery ~of the coal reserve. <br />WEM's to this stipulation will be considered only at the time operations <br />are proposed, and will be subject to the Forest Land and Resource <br />Management Plan in effect at the time of consideration, and will be subject <br />to applicable regulatory and environmental compliance requirements. <br />Granting of a YiE61 is a Forest Serviee' discretionary action which the <br />operator should not. routinely expect. The Forest Service reserves the <br />right to impose other stipulations in Che same area of this leasehold if a <br />wEM is granted. <br />Aay changes to this stipulation mill be made in accordaaee with the load use <br />' plan. sad/or~ the regulatory provis~iona for.auch ehaagea.~ (For guidance on.~~the <br />use of this stipulation, see HLM Manual 1624 and 3400. or FS Manual 165.0 ~aad <br />2820.1 <br />Coal-CSV 40-60 2/95 <br />