Laserfiche WebLink
<br />EXI~ITiI'T I) - f2ECt..ANATIf1N F'L.APJ <br /> <br />1, Dire to the variable depth of the topsoil material originally <br />removed ar,d st.rrcl.pi.led, it is e::pected that the topsoil material will. <br />total ~r)Qr:~ to BUrjQ r_r.r6ic yards in stGraye. That amGUr~t will yield <br />abGllt 4 to 6 inches Gf topsoil material evenly distributed across the <br />site. <br />... Side slopes wi:tl be graded .:,:1 in the course of mining. <br />+, TGpsc~il replaced should be at least 4 to 6 inches thick. <br /><<. Upon {final grading Gf the side slopes and mine floor, the entire <br />arc-.a will. be chiseled to a depth Gf 6 to 8 inches before topsoil <br />material is evenly redistribr.r'ted and cort~pact.erJ to provide a firm <br />seedbed, Fertilizers will Ge added as required by a soils analysis <br />cornpleted jr.rst prier to seeding. Seeding will be done in the late <br />fall or very early spring in Grder tG take advantage of the spring <br />rains and t.o get a headstart on competition from annual weeds. <br />5. Seed mi};tore and rates of seeding that will be followed for <br />r-ecl.amation of the site will be as ot.rtlined in SCS letter (Es;hibit 1- <br />Ha). <br />h. Seeding will be done with a grass drill. <br />1. Na ponds, streams, roads, Gr huildings will remain on the site <br />~follGwing reclamation. <br />9. Not applicable. <br />9. 'fhe Gperator will agree to post a financial warranty of <br />~5,000.GO. <br />4 <br />