Laserfiche WebLink
Doc Date:12/11/2001 <br />Section 816.42 (f) Continued. <br />III III'llllllllllll <br />Structures, and Table 60, Temporary Diversion Structure Specifica- <br />tions. There will be no significant excess excavated material <br />after construction of diversion structures. <br />(g) Diversions shall not be constructed or operated to divert water <br />into underground mines without the approval of the regulatory authority <br />under Section 816.55. <br />None of the proposed diversions will drain into underground mines <br />since no underground mines exist in the area. See Section 780.27. <br />SI~ Section 816.44 Hydrologic balance: stream channel diversions. <br />• <br />(a) Flow from perennial and intermittent streams within the permit area <br />may be diverted, if the diversions-- <br />(1) Are approved by the regulatory authority after making the findings <br />called for in Section 816.57 (a). <br />(2) Comply with other requirements of this Subchapter; and <br />(3) Comply with local, State, and Federal statutes and regulations. <br />No diversions of intermittent or perennial streams are planned <br />within the permit area, as documented by Map 16, Kerr Mine Area <br />Surface Water Hydrology. The intermittent stream channels of Buah, <br />Williams, and Sudduth Draws will be maintained in their natural <br />positions. <br />816-42 <br />