Laserfiche WebLink
Section 816.42(f) Continued. <br />Structures, and Table 60, Temporary Diversion Structure <br />Specifications. Topsoil and common material excavated during <br />diversion ditch construction will be stored in the berms of the <br />ditches. There will be no significant excess excavated material <br />after construction of diversion structures. <br />(g) Diversions shall not be constructed or operated to divert water into <br />underground mines without the approval of the regulatory authority under <br />Section 816.55. <br />None of the proposed diversions will drain into underground mines <br />since no underground mines exist in the area. See Section 780.21. <br />Section 816.44 Hydrologic balance: stream channel diversions. <br />(a) Flow from perennial and intermittent streams within the permit area <br />may be diverted, if the diversions-- <br />(1) Are approved. by the regulatory authority after making the findings <br />called for in Section 816.57 (a). <br />(2) Comply with other requirements of this Subchapter; and <br />(3) Comply with local, State, and Federal statutes and regulations. <br />No diversions of intermittent or perennial streams are planned within <br />the permit area, as documented by Map 16a, Kerr Mine Area-Surface --- <br />Water Hydrology.- Ihe-intermittent stream channels_of_Bush,.Williams, <br />and Sudduth Draws will be maintained in their natural positions. <br /> <br />816-42 aaR Revised - January, 1991 <br />