Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No. Task Description Lost (f) <br />--------I-----------------------------------------------I---------- <br />N/A <br />I I <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING WELL SEALING <br />Task No. Task Description Cost (S) <br />--------I------------------------------------------------I ---------- <br />N/A <br />I I <br />I <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No. Task Description Lost (S) <br />-------I--------------------------------------------------I----------- <br />4 Scrap steel salvage/disposal. 25c.y. @ s10.00/c.y 5250 <br />4a DemolitionDispose of 10'x10'x20' mass @ 50.22/c.f 5440 <br />5 Seeding As per attached worksheet 54.236 <br />8 Fencing Assume 1830 l.f. @ 53.73/1.5. 56.826 <br />6 Mob/Demob As per attached worksheet 5763 <br />Subtotal (M): 512.514 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 520.509 <br />II. INDIRECT COSTS <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No. <br />-------- Item Description <br />------------------------------- <br />--'-- <br />-- <br />----- Cost (f) <br />------------ <br />I <br />1. PuDl is Liability Insurance.... 1.550X of dir. 5318 <br />2. Contractor's Performance Bond 0.975% of dir. 5200 <br />3. Contractor's Profit........... 10.00X of dir. 52.051 <br />4. Job Superi ntendent..AS per task no . 7 wor sheet 51.965 <br />Subtotal (A): 54,534 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 & P): 525.043 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No. <br />--------I--------- Item Description <br />---------------------------- ~ <br />-------------I C05t <br />------- (f) <br />----- <br />I <br />1. Minerals <br />Program Admin. Fee at S I <br />.OOX of cntr. <br />51 <br />.252 <br />NET INDIRECT LOST PERCENTAGE: 28.21% Subtotal (B): 51 .252 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 55 .786 <br />70TAL PERFORMANCE BOND AMOUNT (direct plus intlirect costs): 526 .295 <br />