Laserfiche WebLink
<br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHWORK -STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (f) <br />__------I-------------------------------------------------I---------- <br />~ N/A ~ <br />~ ~ <br />~ ~ <br />~ ~ <br />Subtotal (H): <br />I. EARTHWORK ~ DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (f) <br />~ N/A ~ <br />I ~ <br />~ ~ <br />~ ~ <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I I <br />I <br />i I <br />Subtotal (I): <br />J. EARTHWORK -TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.~ Task Description <br />3 <br />Replace 6" to 12" of stockpiled topsoil on the <br />4.4 acre stockpile area located at the south end <br />of the processing area. <br />Cost (1) <br />52.436 <br />Subtotal (J): 52.436 <br />