Laserfiche WebLink
<br /> <br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />-------------------------- <br />NET PROJECT HOURS - JOB SUPERINTENDENT COST ESTIMATING FORM <br />TASK NO.: 7 PREP BY SSS TASK FILE NAME M020.1 <br />DATE 04-Jun-96 PERMIT #: M-76.020 OPERATION Thomas Pit <br />PERMIT ACTION Routine Reclamation Cost Estimate Update <br />------------------------------------------------- <br />TASK DESCRIPTION Calculate Net Project Hours and Superintendent Costs <br />TASK <br />NUMBER <br />TASK DESCRIPTION TASK <br />HOURS ~ EQUIPMENT <br />USED CPM <br />CHARTING NET <br />JOB HOURS <br /> <br />1 I =1 <br />Regrade sediment pond <br />1. I <br />38 I <br />LAT D8N ~ ~I <br />------~-> <br />1. <br />38 <br />2 Rip facilities and stockpile areas 42. 21 ~ CAT D8N ------~-> 42. 21 <br />3 Replace topsoil on 4.4 acre stockpile area 20. 13 CAT D8N ------~-> 20. 13 <br />4 8 4a ~ Waste disposal and steel salvage 40. 00 weld trk '40.09" 0. 00 <br />5 Revegetate 14.4 acre facilities 8 stockpile areas) 8. 00 Tractor ~ '4.00" 4. 00 <br />8 1 Fence extension installation I 40. 00 I Crew I '40.00' I 0. 00 <br />TOTAL TASK HOURS ~ p. 1: 151.72 NET PROJECT HOURS- p. l: 61.72 <br />