My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE122252
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE122252
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:20 PM
Creation date
11/25/2007 10:13:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984063A
IBM Index Class Name
Permit File
Doc Date
11/13/2002
Section_Exhibit Name
Rule 2.05 Operation and Reclamation Plans
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fill in and regrade the Sediment Pond SP-1, Collection Completed August 2002 <br />and Diversion Ditches, and reseed azea disturbed <br />Monitor for Rill and Gulling Ongoing <br />Apply for Final Bond Release September 2006 <br />4. Reclamation Plan <br />The reclamation plan for the Harvey Gap Mining Project is designed to blend the disturbed area into the <br />existing topography but at the same time maintain the integrity of the mine and provide access to the <br />scoria pit located east of and adjacent to the mine portals(see Map HGP-7: Pre-Law Disturbance) <br />All of the structures, buildings, trailers, and equipment have been removed from the site. The portals <br />structures have been left in place and covered with a minimum of two feet of cover. A four inch steel <br />pipe was installed in the #1 Slope entry through the seal in order to monitor the water level in the mine <br />and dischazge water if necessary. A m;n;mum of 25 feet of compacted soil was placed in each portal as <br />a seal. <br />The area has been graded to the postmining topography approved in the previous permit. The regraded <br />azea has been seeded and the vegetation is well established at this time. <br />The access road will be left in place as shown on the drawing titled: Final Topo with Cross Section <br />Locations, to provide access to the scoria pit located adjacent to the mining azea. The sections of road <br />not necessary for access to the scoria pit will be removed and graded to blend the area into the existing <br />topography. <br />The disturbed area has been regraded to a maximum slope of 2:1. <br />The collection ditches and diversion ditches have been regraded and filled in. The reclaimed diversion <br />and collection ditches have been seeded with the approved seed mixture listed in Table 17. The seed <br />was applied using hydro-seeding methods. <br />Eastside Coal Company, Inc. is proposing a 35% cover for the success standazd at the Eastside Mine. As <br />discussed in the vegetation secfion, cover will be the criteria by which revegetation success would be <br />established. The baseline information was obtained from areas of previous disturbance with the results <br />being a higher percentage of shrubs and annual weeds. The herbaceous cover on the disturbed area <br />results being a high percentage of shrubs and annual weeds. The herbaceous cover on the disturbed azea <br />including the perennial and biennial forbs and succulents is 10%. One transect ran on an azea which had <br />not been previously disturbed indicated approximately 3% cover for the grass plants. Inclusion of the <br />annual weeds raised this percentage to 15% cover for the grass-like plants. Again, most of the cover <br />(47% by species composition) is provide by sagebrush. <br />The methods used to determine the amount of cover will be the same methods utilized for the baseline <br />information for the office and disposal sites. The method to be used for the vegetation cover will be the <br />91 Minor Revision 10/08/02 <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.