• ~ •
<br />Table 6-1 coot -page 2
<br />Topsoil Coordinates Size Approximate Created
<br />Pite ID Location North East (acres) CYDS Date
<br />E7&1 E pit SE pile small 402,490 1,422,730 0.7 10,000 12!78
<br />~E78-2 Middle E pit pile 404,400 1,423,100 4.5 25,238 12/78
<br />E78-3 E fuel storage area pile 405,425 1,418,165 2.1 18,153 12/78
<br />E79.4 E pil SE pile large 401,900 1,422,850 2.8 34,010 pre 12/79
<br />E79~ Castor Gulch road E pit pile 401,200 1,420,950 9.0 208,988 pre 12/79
<br />E79-8 S curve pile Eest (several add-ons) 406,000 1,418,150 3.1 91,587 pre 1979
<br />E87-12 E pit regrade pile 403,850 1,422,350 4.1 73,278 1987
<br />E89-11 E pft Ute Gulch 402,100 1,420,100 0.2 1,100 1989
<br />E93-4 NoRh E pit #4 408,750 1,421,050 0.9 16,746 1993
<br />E93-5 Middle E pit #5 403,955 1,419,950 0.8 53,610 1993
<br />E94-1 W of D East Road 404,280 1,420,370 0.3 2,304 1994
<br />E94-2 N of D East Road 407,270 1,418,750 0.2 1,200 1994
<br />E61 East Buzzard Gulch 411,100 1,409,720 0.4 4,224 pre 87
<br />EG1 Elk dam 401,200 1,414,920 0.1 1,027 12/87
<br />EM1 E. of Explosive Magazine 411,330 1,414,300 0.4 5,458 6180
<br />EP2 East Pyeari Dam #1 East 412,150 1,428,900 0.3 3,700 1988
<br />EP3 East Pyeatt Dam #2 West 413,100 1,426,380 0.6 7,500 1988
<br />EP4 East Pyeatt Dam #2 East 413,200 1,426,750 0.4 4,500 1988
<br />F95-1 F-Pit 403,500 1,426,200 3.7 92,246 1995
<br />F95-2 F-Pit north of F95-1 405,300 1,426,400 7.2 181,930 1
<br />F96-1 F-Pit North of A93-5 408,311 1,428,096 1.7 22,120
<br />F98-2 F-Pit North of F95-1 404,200 1,426,200 2.2 46,032 1996
<br />FS1 Anfo silo 410,280 1,410,900 0.2 550 1/80
<br />GP-1-93 Grouse Pond 412,925 1,429,530 0.9 13,212 1993
<br />H93-1 H pit West #1 411,540 1,422,060 4.7 176,308 1993
<br />H93-2 H pit NoRh #2 412,720 1,422,940 3.3 95,668 1993
<br />H93-3 South H pit #3 406,940 1,424,040 5.2 115,128 1993
<br />JG1 Johnson Gulch Dam #7A 411,700 1,419,700 1.6 25,116 6/80
<br />JG2 Johnson Gulch Dam #8 412,500 1,420,150 1.2 15,458 1/86
<br />1288
<br />
|