Laserfiche WebLink
• <br />Table 5-1 Trapper Mine Topsoil Pile Inventory (1 ~ <br />Topsoil <br />Pile ID <br />Location Coordinates <br />North <br />East Size <br />(acres) Approximate <br />CYDS Created <br />Date <br />A78-4 GB well site 410,070 1,417,400 0.5 7,805 pre 1976 <br />A77-1 Afield coal pile 409,850 1,411,300 1.3 12,944 6/77 <br />A88.8 North A pit sandrocks 409,650 1,421,100 3.1 49,932 1/86 <br />A88-1 North A Haul Road W of REA Line S 405,450 1,425,100 1.7 60,480 1988 <br />A91-8 MR-111 Relocate MP6 & AB (1991) 410,800 1,421,400 5.1 132,424 1991 <br />A92-1 North A Road East of East Pyeatt 411,900 1,427,900 12.5 388,002 1992 <br />A92-2 Middle Pyeatt Regrade Spoils 409,800 1,426,000 6.0 179,676 1992 <br />A92-3 North A Road East of Wesl Pyeatt 412,100 1,424,400 0.6 7,832 1992 <br />A92-4 North A Road Middle Pyeatt 411,300 1,425,600 7.2 171,972 1992 <br />A92-5 North A Road East Pyeatt 412,700 1,426,300 7.8 194,000 1992 <br />A93-1 A pit South #1 406,550 1,428,040 3.9 86,454 1993 <br />A93-5 South A pit #5 406,920 1,428,580 4.3 107,468 1993 <br />A93-8 South A pit #8 407,200 1,429,280 4.4 24,088 1993 <br />A94-2 E of Grouse Drainage 412,000 1,429,300 4.4 115,230 1994 <br />A94-4 S of A pit cut 408,500 1,429,600 3.9 117,040 1994 <br />A95-1 Soulh end of A-Pit 407,100 1,413,920 5.1 147,288 1995 <br />A95-2 Oak Pond 410,400 1,433,030 1.1 13,548 5 <br />A98-1 Mid A Spoil Road 409,800 1,429,450 2.1 52,612 19 <br />A96-2 North A Pit west of A 95-2 411,100 1,432,100 3.0 87,460 1996 <br />ASH1 Johnson Gulch East Tributary 408,000 1,421,200 3.9 97,092 1992 <br />ASH2 Johnson Gulch East Tributary 408,200 1,422,000 1.3 27,488 1992 <br />BUZ92-1 Far East Buzzard Pond #1 411,100 1,410,250 0.4 882 1992 <br />CG1 Coyote Gulch 411,050 1,412,200 4.8 18,309 5/78 <br />087-1 D pil temp N. 405,500 1,413,100 1.0 7,436 12/87 <br />092-1 Deer Pond #1 400,700 1,417,650 3.7 23,518 1992 <br />093-1 North D pit #1 407,725 1,418,160 0.5 20,570 1 <br />493~ <br />09&2 Middle D Pit 402,660 1,415,890 4.3 74,060 ~ <br />098-3 Soulh D Pit 401,180 1,415,820 2.4 31,184 99 <br />DR4 D haulroad #3 Ramp 404,800 1,418,000 0.5 3,500 pre 12177 <br />1?i9B <br />