Laserfiche WebLink
• The table below describes the time sequence of the mining of the amendment area. <br />TABLE 2.05.3-1 -TIMING OF OPERATIONS <br />• <br />ITEM DESCRIPTION DATE <br />1 Leave open slot cut immediately south of BB Road while mining west to <br />eastern edge of 2700 Road End 2000 <br />2 Install BB Road Detour Road. Atso install power and phone lines along <br />this detour road. 2nd Quarter <br />of 2000 <br />3 Mine through BB Road north to West Lateral Ditch. Mid-2000 <br />4 Install West Lateral Ditch Detour as shown on Map 2.05.3-1. Start 2001 <br />5 Install Enstrom, Wilcox, Johnson access road from Morgan road Start 2002 <br />6 Mine through 2700 Road going west. Mid 2002 <br />7 Place 2700 Road and BB Road in original locations as a gravel surface. <br />Continue using detour. Restore West Lateral Ditch in permanent pipeline <br />location. Mid 2004 <br />8 Pave 2700 Road and BB Road in original locations and restore Sunshine <br />Ranch Corner intersection. Also lay power and phone lines in original <br />locations. Mid 2005 <br />9 Remove BB Road detour and reclaim road area End 2005 <br />10 Mine west to last cut at western permit boundary End 2010 <br />11 Backfill final cut with overburden stockpile Mid 2011 <br />12 Retopsoil and revegetate final cut area End 2011 <br />13 Replace BB Road from Sunshine Ranch Corner to western boundary. <br />Also re-install power lines and phone lines along road. End 2011 <br />14 Continue to irrigate and monitor reclaimed areas until final bond release. <br />Many areas will be given back to the original owners, especially irrigated <br />areas, much earlier than the date shown here. Start 2022 <br />. ;3ev~_5=c ~/99i 2.05.3-4 <br />