Laserfiche WebLink
,,,. <br />Page 4 November 9, 1979 <br />Mr. Schmieding <br />3. Reclamation Costs <br />a. Due to the type of mining where the pit becomes the larger portion of <br />major disturbances, the cost of reclamation is considerably less <br />than normal. However, the operator will concur in $1,000 per acre <br />for topsoiling and seeding. <br />I hope that these comments will satisfy your concerns over these two mining <br />operations. <br />Sincerely, <br />i ~ <br />Gilbert F.~ ahl~L~ ~ <br />Enclosures <br />a <br />