Laserfiche WebLink
DETAILED DESCRIPTION <br />OVERLAND DITCH MITIGATION PLAN <br />\J <br />Present Situation: <br />The Roberts-Stucker Ditch presently diverts flows fran Overland Ditch in <br />Section 3, R.92W., T.13S., 6th P. M., see Map 5-3, location #1. 'Ifiis late <br />season water flows down the Fast Iduatcap stream channel to Main La~atcap and <br />is diverted out of Main Ia~atcap at the Ia~berts-Stucker Ditch headgate. The <br />Roberts-Stucker Ditch then transfers water to the Stucker Mesa area. <br />Tl~e Oak Mesa Ditch currently diverts water fron the Overland Ditch in Ser <br />tion 5, R.92W., 'P.135., 6th P.M., see Map 5-3, location #2. This late <br />season water flows down West Fbatcap to Oak Mesa Ditch which transfers water <br />to Wakefield Mesa. 'Ihe headgate for Oak t~sa Ditch is in Section 21, <br />• R.92W., T.13S., 6th P. M., location #3. <br />After consultation with water users and appropriate government agencies, a <br />water replacement plan was mentioned in a stipulation to Lease C-37210. The <br />intent was to route Overland Ditch water around the permit area because CWI <br />would not be undermining the West Imatcap stream channel. <br />Mitigation Plan: <br />1. Roth the 13~berts-Stucker Ditch and Oak Mesa Ditch would divert water at <br />the West Fa~atcap location (location #2). 7h is has been previously done <br />and approval has been given by the Overland Ditch Company. In this way, <br />• both ditches can share transmission losses. This change will be done in <br />the irrigation season, 19155. <br />