My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121888
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121888
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:20:06 PM
Creation date
11/25/2007 9:48:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Permit File
Doc Date
2/2/1998
Section_Exhibit Name
Letter Addressing Stipulation No. 1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~:"r_;~7-Senera Coal Company -: <br />- Permit No. 96R0542F <br />fi ,- ,Sw Initial Approval <br />Page 3 - <br /> <br />..; , _ ,. -.. <br />,., <br />1'.... . . <br /> <br />THE FOLLOWING PARTICULATE EMISSIONS CONTROL MEASURES SHALL 8E USED FOR ENFORCEMENT <br />PURPOSES ON THE SOURCES COVERED BY THIS PERMIT, AS REQUIRED BY THE AIR QUALITY <br />CONTR0LCOMMISSIONREGULATIONN0.1. THISSOURCEISSUBJECTTOTHEFOLLOWINGEMISSION <br />GUIDELINES: <br />a. Mining Activities -Visible emissions not to exceed 20%, no off-property transport of visible <br />emissions. <br />b. Haul Roads - No off-property transport of visible emissions shall apply to on-site haul roads, the <br />nuisance guidelines shall apply to off-site haul roads. <br />c. Haul Trucks - No off-property transport of visible emissions except that when operating off the <br />property of the owner or operator, the applicable guidelines shall be no off-vehicle transport of <br />visible emissions. <br />Control Measures <br />1. Adequate soil moisture must be maintained in topsoil/overburden to control emissions during <br />removal. <br />2. Topsoil stockpile shall be revegetated within 6 months. <br />3. Emissions from material handling li.e. removal, loading, and hauling) shall be controlled by <br />reduction of drop-height. <br />4. Vehicle speed on unpaved roads and disturbed areas shall not exceed a maximum of 40 m.p.h. <br />Speed limit signs shall be posted. <br />5. Haul trucks shall be limited to a maximum of 120 total trips per day (all vehicles combinedl. <br />6. Hauling of coal on the haul road shall occur only between the hours of 8:00 am and 12:00 <br />midnight. <br />7. Unpaved haul roads shall be graveled and treated with chemical stabilizer per manufacturer's <br />specifications to control fugitive particulate emissions. <br />8. All disturbed areas shall be revegetated per the fugitive dust control plan submitted with the <br />application. <br />107/69/1 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.