Laserfiche WebLink
<br /> <br />• <br />Rule No." <br /> <br /> <br />xhibit No. SENECA II-W <br />LIST OF EXHIBITS <br />(Continued) <br />Title <br /> <br /> <br />olume <br />2.05.313) <br />(Continued) <br /> 13-19. 2 Plan & Profile, Haul Road B 30 <br /> 13-19. 3 Plan t Profile, Haul Road B 10 <br />. __ 13-15. 1 Plan & Profile, Haul Road C 10 <br /> 13-15, 2 Plan & Profile, Haul Road C 10 <br /> 13-18 .1A Road F (AS-Built) 10 <br /> 13-19 .1A Haul Road G (AS-Built) 10 <br /> 13 -19 .2A Haul Road G (As-Built) 30 <br /> 13-19 .3A Haul Road G (AS-Built) 10 <br /> 13-19 .4A Haul Road G (AS-Built) 10 <br /> I3-20 .1 Proposed Haulroad H 10 <br /> 13-21 .1 Haulroad "I" Plant Profile Design 10 <br /> 13-22 .1 Haulroad "J" Plant Profile Design 10 <br /> 13-23 .1 Haulroad "R° Plant Profile Design 10 <br /> 13-24 .1 Purposed Haulroad "L" 10 <br /> 13-25 .1 Interim Oil Well Access Road 10 <br /> 13-25 .2 Postmine Oil Well Access Road 10 <br /> 13-26 .1 Ridgeline Access Road Plan t Profile 10 <br />2.05.6.3 16-1 Watez Rights 11 <br />2.06.8 16-2 Alluvial Deposits Along Dry Creek, Sage <br /> Creek, and Grassy Creek, Sheets 1 and 2 of 2 11 <br />16-3 Land Use, Flood Irrigated, and Subirzigated <br /> Areas Along Dry Creek, Sage Creek, and <br /> Grassy Creek, Sheets 1 and 2 of 2 11 <br />16-3A Alluvial Valley Floor 11 <br />2.05.6.3 17-1 Mining Induced Drawdowns in the Overburden <br /> and Wadge Coal Aquifers 12 <br />• <br />17-1A Mining Induced Drawdowns for Overburden & <br /> Wedge Coal Aquifer 12 <br />17-2 SEDIMOT II Watershed Boundaries 005 and 006 <br /> Gulch Watersheds 12 <br />17-3 SEDIMOT ii watershed Boundaries 005 and 006 <br /> Gulch Watersheds Postmining 12 <br />17-4 Flow Net Analysis Wadge Overburden Aquifer 12 <br />2.05.4 19-1 Backfilling and Grading Schedule 12 <br />19-1A Backf ill t Grading Schedule (II-W South) 12 <br />20-1 5-Year Permit Area Disturbance Map 13 <br />20-2 Postmining Topography 13 <br />20-2A Postmining Topography II-W South 13 <br />20-3 Postmining Topography Map, TAHR 13 <br />20-4 .1 Pre- and Postmining Slopes Cross Section S-1 13 <br />20-4.2 Pre- and Postmining Slopes Cross Section <br /> S-2 fi S-3 13 <br />20-4.3 Pre- and Postmining Slopes Cross Section S-4, <br /> S-5 & S-6 13 <br />20-4.4 Pre- and Postmining Slopes Cross Section N-1 & <br /> N-2 13 <br />20-9.5 Pre t Postmining Cross-Sections II-W South 13 <br />20-5.1 Postmining Stream Channels 006 Gulch 13 <br />20-5.2 Postmining Stream Channels 006-NE1 13 <br />20-5 .3 Postmining Stream Channels 006-NE2 and <br /> 006-NE1 (upper) 13 <br />20-5.4 Postmining Stream Channels 006-E1 and 006-E2 13 <br />20-5.5 Postmining Stream Channels 006-SE1 13 <br />20-5.6 Postmining Stream Channels 005-E1 13 <br />20-5.7 Postmining Stream Channels 005 Gulch 13 <br />20-5.8 Postmining Stream Channels 006-NE3 and 006-NE4 13 <br />20-5.9 Postmining Channels Profiles foz II-W South 13 <br /> 2.05.5 21-1 Topsoil Replacement 13 <br />• 22-1 Postmining Vegetation Map Mine Area 13 <br /> 22-1A Postmining Vegetation Map II-W South Mining Area 13 <br /> 22-2 Post Disturbance Vegetation TAHR 13 <br /> 'Regulation citations correspond to application form <br />PR04 4 Revised 09/04 <br />