My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121704
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121704
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:59 PM
Creation date
11/25/2007 9:38:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057A
IBM Index Class Name
Permit File
Doc Date
11/17/2004
Section_Exhibit Name
Permit Index
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENECA II-W <br /> LIST OF EXHIHIT3 <br /> (Continued) <br />l <br />N <br />• R <br />~ E <br />hibit N Ti <br />l V <br />l <br />u <br />e <br />o. x <br />o. t <br />e ume <br />o <br />2.04.10 10-1 Premining Vegetation Types and Sample <br /> Location Map 6 <br /> 10-2 Pre-Disturbance Vegetation Types, TAHR 6 <br />" -- 10-3 Pre-Mining Vegetation Types & Sample Location <br /> Map, II-W South 6 <br />2.04.11 11-1 Hig Game Aerial Census Observations 6 <br /> 11-2 Wildlife Sampling Locations 6 <br /> 11-3 Seneca II-W South Extension 199'7 Raptor Nest <br /> Location 6 <br />2.05.3 12-1 Seneca II, Yoast and Seneca II-W Coal <br /> Resource Areas 7 <br />2.05.3(2) 12-2 Operations Plan 7 <br /> 12-3 Operations Plan ZI-W L.O.M. 7 <br /> 12-3a Operations PLan II-W L.O.M <br /> Wadge Seam 6 Highwall Miner 7 <br /> 12-3b Operations Plan II-W L.O.M. <br /> Sage Creek/Wolf Creek and Highwall Miner 7 <br />2.05.3(3) 13-1 Facilities Map 8 <br />2.05.314) 13-2 Surface Hydrology Map 8 <br /> 13-2A Surface Hydrology 8 <br /> 13-3 Surface Water Control Plan Tie-Across Haul Road B <br /> 13-4 Watershed Boundary (Partial) 8 <br /> 13-5 Proposed Pond 005 8 <br />• 13-5A <br />13-6 Pond 005 As-Built <br />Pond 006 Phase II As-Built B <br />8 <br /> 13-6A Pond 006 Phase IV Subwatershed Map e <br /> 13-6B Pond D06 Phase IV Design 8 <br /> 13-6C Pond 006 Phase IV Pre-Settling Hasin Design 8 <br /> 13-7 Proposed Sedimentation Pond 009 S <br /> 13-7A Sedimentation Pond 009 As-Built B <br /> 13-5 Pond 015 Design & watershed Maps, Sheets 1 and 2 <br /> of 2 9 <br /> 13-SA Pond 016 Design s Watershed Maps, Sheets 1 and 2 <br /> of 2 9 <br /> 13-SB Pond 017 Design & Watershed Maps, Sheets 1 and 2 <br /> of 2 9 <br /> 13-BPP Topsoil Stockpile PP Sumps PP-S1 and <br /> PP-S2 (Aa-Built) 9 <br /> 13-SQQ Topsoil Stockpile QQ Sump QQ-S1 (AS-Built) 9 <br /> 13-BRR Topsoil Stockpile RR Sump RR-SS (AS-Built) 9 <br /> 13-9 'Pond 15 As-Built 9 <br /> 13-9A Pond i6 Ae-Built 9 <br /> 13-9H pond 016 assign Revision 9 <br /> 13-9C Poafl 016A Ae-Built 9 <br /> 13-9D Pond 17 A8-8uilt 9 <br />2.05.313) 13-10 Typical Road Details 9 <br /> 13-11.1 TAHR IAs-Built) 9 <br /> 13-11.2 TAHR (AS-Built) 9 <br /> 13-11.3 TAHR (AS-Built) 9 <br /> 13-11.9 TAHR IAs-Built) 9 <br /> 13-11.5 TAHR (As-Built) 9 <br /> 13-11.6 TAHR (As-Built) 9 <br /> 13-11.7 TAHR (AS-Built) 9 <br /> 13-11.8 TAHR IAs-Built) 9 <br /> 13-12.1 _ Mine Entrance Haul Road (AS-BUiltl 9 <br /> 13-12.2 Mine Entrance Haul Road (AS-BUiltl 9 <br /> 23-12.3 Mine Entrance Haul Road (AS-Built) 9 <br /> 13-12.9 Mine Entrance Haul Road (AS-Built) 9 <br /> 13-13.1 Haul Road A (AS-BUiltl 9 <br /> 13-13.2 Haul Road A (AS-Built) 9 <br /> 13-13.3 Haul Road A (As-Built) 9 <br /> 13-13.9 Haul Road A (AS-Built) 9 <br /> 13-13.5 Haul Road A (AS-Built) 9 <br /> 13-19.1 Plan 6 Profile, Haul Road B 10 <br />PA09 3 Revised 09/04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.