Laserfiche WebLink
<br />Colorado Division of Minerals and Geology sheet 1 of 2 <br />ESTIMATING FORM - EOUI PMENT MOBILIZATION / DEMOB[LIZATI ON <br />_________________________________________________________ <br />_________________________________________________________ <br />Task #... 4 Prep. by wHE Filename..M074-4 <br />Date..... 08-OCt-99 Permit # M-99-074 Mine......Brown Derby Mine <br />Permit Action........ Application review 110(2) <br />Task Description..... Haul reclamation equipment to and from job site <br />HOURLY EQUIPMENT COST <br />_____________ ________ NOTE - This is a list to select from, not a list of mandatory items to incl ude. <br />Mob/Demob Eqp . -Tract or : 6x4, 75,000 lb GVw, 375 HP, diesel powered <br /> -Lt. Trailer 25 ton folding gooseneck, drop deck <br /> -Med. Trailer 50 ton folding gooseneck, drop deck <br /> -Hry. Trailer 120 Ton folding gooseneck, drop deck <br /> -Pilo[ Lar On-h ighway light duty truck, 4x2, 130 hp, 1/2 tan rating, gasol ine powered <br /> -Hyd. Crane Grove RT58E rough terrain hydraulic crane, 20 ton capacity, 125 hp, 70 ft. boom <br /> -Fuel Truck 6x4, 3,600 gallon capacity, 210 HP, diesel powered <br /> -Cube Truck 6x4, 2,500 gallon capacity, 210 HP, diesel powered <br /> -Flatbed Truck: 30,000 lb GVY, 210 HP, diesel powered <br />Last Update: ________________________________ __________ _____________________ ___________ <br />August, 1997 (trucks) <br />------------- -------- Lt. Rig Med.Rig Hry.Rig Pilot Hydraulic Fuel Lube Flatbed <br />Cost Breakdown: <=25 T. 26-50 T. > 50 T. Car Crane Truck Truck Truck <br />Ownership Cost/hr = 525.59 528.10 531.38 51.73 524.12 56.88 512.66 57.88 <br />Operating Cost/hr = 528.38 530.17 532.34 54.82 531.48 519.57 525.56 511.82 <br />Operator Cost/hr = 522.61 522.61 522.61 521.82 523.13 522.35 521.24 522.35 <br />Helper Costfhr = 521.82 521.82 421.82 50.00 50.00 50.00 50.00 50.00 <br /> Total = 598.40 5102.70 5108.15 528.37 578.73 848.80 559.46 542.05 <br />NON-ROADABLE EQUIPMENT: <br />---------------------- weight Ownership Haul Rig Fleet Size Haul Trip Return Trip DOT Permit <br />Machine Description <br />____________________________ (tons) <br />____________ Cast/hr <br />___________ Cost/hr <br />____________ (no. hauled) <br />_______________ Cast/hr <br />____________ Lost/hr Cost/ea <br />__________________________ <br />____________________________ <br />CAT 446B Backhoe Loader ____________ <br />9.80 ___________ <br />512.05 ____________ <br />598.40 _______________ <br />1 ____________ <br />5110.45 __________________________ <br />598.40 <br />Subtotals 5110.45 598.40 50.00 <br />