Laserfiche WebLink
BN 111 LOADOUT <br /> <br /> <br />• <br />V <br />2.05.3 (2) Operation Description <br />All of the 3 + acres in the railroad loadout lease will be <br />affected during the life of the railroad loadout. A plan <br />view of the loadout is shown on Ea656t} L, The two phases <br />of the operation are: <br />Phase I Construction December, 1982 <br />Phase II Coal Loading December, 1982 to end of mine. <br />653 <br /> <br />