Laserfiche WebLink
BN ~I1 LOADOUT <br /> <br />r <br /> <br />2.05.3 OPERATION PLAN - PERMIT AREA <br />2.05.3 (1) Production Methods and Equipment <br />Highway trucks will enter the loadout from existing haul roads <br />and will drop their loads into a 25 ton coal hopper. Railroad <br />cars will be loaded by a 36" conveyor extending from the 25 ton <br />coal hopper to the railroad tracks, or by front end loader. Up <br />to 435,000 tons per year could be loaded at this site. No stock- <br />piling is planned. (See Map No. ZI1 ~ sce Exkibit L) <br />652 <br /> <br />