Laserfiche WebLink
SANTA FE LOADOUTS <br />1 f t ~+ <br /># 1 1.74 in. r. ---- x 1.31) ac.=. 19 ac.- ft. or 8211 ft. <br />12 in. <br />,;. <br />1 ft _ <br /># ~ 1.74 in.x ---- x 2.02 ac.=.29 ac.- ft, or 126.=~ ft. <br />12 in. <br />Sediment storage volumes are calculated using the Universal <br />Soil Loss Equation: <br />Lease Acres R F; LS C P Del. Ratio Tons/Year <br />----- ----- - - -- - - ---------- --------- <br /># 1 1 . 31) 7,Qi . ~ 0 . 15 1 . 0 1 . 0 . 50 2. 2 <br /># 2 ~. 02 75 . •'+1) . 15 1 . 0 1 . 0 .50 3. 4 <br /># 1 2.2 tons/year = 55 cubic ft./yr ;; ~+ yrs = 165 ft <br />3 <br /># 2 :;.4 tons/year = 85 cubic ft./yr x 3 yrs = 255 ft <br />'•,,;,, Total Volume: <br />J •? J J <br /># 1: 8211 ft + 165 ft ~ 8376 ft or 310 yd <br />3 ~ 3 3 <br /># ~: 12632 ft + 255 ft = 12887 ft or 477 yd <br />The sumps will have no discharge devices and will be located as <br />shown on Map No. Z3. <br />The e>:cavated material from the sumps will be used to create <br />small berms appror.imately 1 foot high, where necessary, along the <br />lease boundaries to contain the runoff within the property. <br />The sumps will be cleaned of sediment when the accumulation <br />reaches 61)% of the ~ year design amount. The sediment will be <br />disposed of at the Refuse Disposal site at the RetonCreekMine A <br />gauge will be installed in order to determine when the pond <br />reaches the 61)% sediment storage level. Revisarl5l93 <br />