Laserfiche WebLink
2.05.3 (41 Ponds. Impoundments and Diversions <br />• Recently both Santa Fe lease areas have been reclaimed consistent with the approved reclamation <br />plan. During reclamation both sites were regraded [o effectively control run-off. Given the new <br />site configurations, EFMC has competed hydrologic designs to control the runoff from the <br />newly regraded lease areas. <br />Run-o(f from bo[h sites will be effectively controlled from both sites utilizing collection ditches, <br />diversion berms and sediment fences as shown on SF Loadout Sites Map, (Map 23). All drainage <br />controlstruaures have been designed [o safely pass [he peak discharge from a 10-year, 24-hour <br />event. All design calcula[ions and resul[s are in [he Small Area Exemption Request for the <br />Loadout areas found in Addendum D. <br />• <br /> <br />n:usca'rnoi.res 615R Revised -November 1993 <br />nizvv~ io,m <br />