Laserfiche WebLink
SANTA FE LOADOUTS <br />2.05.5 Post-Mining Land Use <br />• Accord:iny to the lerase agreements for both loadout ~~ites, the <br />railway company desires that the land be left in indi.istrial use <br />as a r_oal loading site. <br />The sumps and berms will remain as sediment control meas~.ires. <br />All coal handling equipment will be removed from the site and all <br />e;:cess fill from the trucF; ramps and haulage road~a will be <br />transported from the site during reclamation. <br /> <br /> <br />618 <br />