My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE121510
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE121510
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:19:52 PM
Creation date
11/25/2007 9:25:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020A
IBM Index Class Name
Permit File
Doc Date
5/23/2007
Section_Exhibit Name
3.0 Reclamation Plan
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
All aspects of the proposed reclamation plan are aimed at achieving the highest <br />possible success in vegetation establishment in consideration of all controlling factors. <br />3.1 POST-MINING TOPOGRAPHY <br />Topographic maps depicting approximate existing and final reclamation contours <br />are presented on Figures 2.2-7a, 2.2-7C, 3.1-2 through 3.1-g. Post-mining slopes and <br />landform configuration are similar to the pre-mining conditions identified in Figure 1.1-2, <br />and existing conditions shown in Figure 2.2-1. Because the disturbed area associated <br />with the operation is of limited area and is located primarily in a draw with steep slopes <br />and rock outcrops existent, post-mining topographic configuration will not be unlike the <br />pre-mining conditions. <br />All disturbed area will be retumed to its former uses, wildlife habitat and <br />rangeland and will be retumed in a manner that is suitable to such use and correlated <br />with surrounding land uses which are generally based on topographic limitations. <br />The upper segment of the road located along the canyon slopes (wildlife habitat) <br />will be reclaimed utilizing a backhoe and bulldozer. Material will be pulled from the <br />downslope and cast into the road area to approximate original drainages, proposed <br />post-mining land use and surrounding land use. <br />Backfilling is discussed in Section 3.3. <br />All grading will be done on the contour where possible. The backfill areas <br />(sealing of drift entries, road work and sediment ponds) will be roughened on those <br />slopes where equipment can be safely operated in order to provide protection against <br />slippage. <br />TR-22 3-3 05/23!07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.